Skip to content

Configure the experience

Before you start

Select the partner entity and the relevant manager program. Confirm application or program approval, source vault, share class, current experience or wrapper, and the authority required by the action.

Follow the task

  1. Open the saved integration and select its appearance or behavior settings.

  2. Configure only the controls available for that integration, including its supported branding and investor experience.

  3. Save, reopen, and inspect the rendered experience with the current configuration.

Configure the experience: actual product controls.
Configure the experience: product controls ยท Product interface with sample records. Select the image to open it at full size.

Use the detailed procedure for the task's field meanings, conditional paths, and operating constraints.

The Partner pages and controls lists the current application locations, registered input controls, and supported action inputs. Read-only values are distinguished from editable forms.

Check the outcome

After a change, use its operation or transaction reference to find the saved record. Reload before relying on new values.

A pending approval or signature shows progress. Check the action-specific result described in the procedure.

Resolve a blocked task

Check the active account, entity, network, authority, required saved dependencies, validation, and data freshness. If an operation is already pending, inspect it before submitting another action.

Use Troubleshooting for missing records, expired items, stale sources, rejected wallet steps, and delayed saved state.

Return to Partner common tasks.